Two buttons with similar labels were regularly causing errors among users, without them being aware of it. They attributed these mistakes to their own mishandling, which masked a genuine interface problem.
A complete redesign for real-time project management with efficiency
The initial request was straightforward: updating a few visual elements of MyPomelo, an internal project management application. After an in-depth ergonomic audit, the diagnosis was different. The issues were not visual; they were structural. I convinced the team to rethink the product from the ground up and led the complete redesign of the application, renamed Elephant Track.
The challenge was to create a digital project management application that would facilitate communication and collaboration between the client and the Product Owner. The goal was to deliver an intuitive interface with simple terminology to ensure a smooth and efficient user experience for both parties.
Understanding real usage before designing
The application revolves around three core features: client request management, test ticket tracking, and data consultation, primarily used by Product Owners. Before engaging in any design thinking, it was essential to understand how these features were actually used on a daily basis.
To do this, I conducted five individual interviews with varied profiles, two experienced client users, two seasoned Product Owners and one newly onboarded Product Owner. These interviews were complemented by an audit of the existing interface.
This combined approach proved essential. Some difficulties were not spontaneously mentioned by users because they had simply grown used to them without realizing it. Direct observation was what brought them to the surface.
Five main friction points were identified at the end of this phase :
- 01
Recurring confusion between two key actions
- 02
A lack of consistency in the experience
The same action could behave differently depending on the screen being viewed. This inconsistency had gradually built up over time, with no shared design reference in place.
- 03
Notifications too discreet to be useful
The notification system existed but went unnoticed. Users were not checking it, and important information was being missed.
- 04
Analytics buried and hard to find
The data indicators dedicated to Product Owners were present in the application, but difficult to access, to the point where new team members could not find them without assistance.
- 05
A client dashboard that went unused
Hard to read and perceived as not particularly relevant, the very users rarely consulted the dashboard it was designed for.
A design phase split into 6 steps
- 01
Design system
Before touching a single mockup, I built the design system along with its documentation. Without this foundation, the entire design phase would have reproduced the same inconsistencies as the existing product. It also allowed me to communicate clearly with the dev team on what was standardised and what was not.
- 02
Menu redesign
The original menu was long, poorly structured, and mixed features of very different levels. Before mocking up anything, I dedicated time to several navigation iterations, card sorting, and alternative information architectures, to arrive at a structure that users from both profiles (client and PO) could navigate without prior learning.
- 03
Delivery section
The design of this section was driven directly by the interviews. In the absence of concrete usage data, verbatims and observed behaviours served as the main reference for each design decision. The two critical buttons that were confused during interviews were repositioned with a clear visual hierarchy and differentiated affordance.
- 04
Monitoring section
This section relied entirely on open source APIs returning JSON data. Thanks to my front-end development skills, I was able to analyse the data directly, identify what was usable and retain only what was relevant for users, rather than displaying everything the API exposed. This combined design and dev approach avoided unnecessary back-and-forth with the developers on feasibility.
- 05
Product Owner (PO) section
Having no initial knowledge of the Product Owners' business goals, I quickly reached out to several of them to understand their actual usage and identify the features they wanted. This work allowed me to address the problems raised during the audit (inaccessible charts, unreadable dashboard) with solutions grounded in their real priorities rather than assumptions.
- 06
Client survey redesign
In parallel with the design phase, I facilitated a workshop with several Product Owners to rework the existing client survey. The previous form had three concrete issues: it was too long, its questions were ambiguously worded, and it did not cover the topics that were genuinely useful for project tracking. The workshop made it possible to start from the POs' real usage and the information they actually needed to process a request, rather than starting from the existing form and patching it. The result is a streamlined questionnaire with clear questions and a scope aligned with what POs use on a daily basis.
Collaboration
The project involved regular exchanges with the DevOps team to validate the feasibility of interface decisions. Several design choices were adjusted following these discussions, particularly around loading state management in the monitoring section and the structure of notifications. The goal was not to defend mockups but to deliver something genuinely implementable without compromising the user experience.
Organisation
Discovery
6 daysKick-off, ergonomic audit, and user interviews. These 6 days led to expanding the initial scope, and a visual update became a full redesign.
Design
35 daysDesign system build, navigation iterations, mockups for the three sections (Delivery, Monitoring, PO), client questionnaire workshop, and documentation for the dev team.
Face
2 days a weekThe project ran in parallel with another assignment. One deliverable produced per session to maintain momentum with the dev team.
Result
The ergonomic audit and 5 user interviews identified 7 critical friction points (confusion between two action buttons, graphs inaccessible to new Product Owners, ineffective notifications). The complete redesign reorganized the navigation architecture, clarified available actions, and restructured access to analytical data to directly address these reported issues.